You need an electrical contractor to take out the permit. You can do the work yourself, if your electrician is willing to sign off on it. Saves one a bit 'o cash. Permits are good, shows you are doing it right. Peace GS
um, a guy in maple ridge (maple ridge times) had a lic for 75 plants, was growing 2250 sog lol. cops chopped it down to 75, lic renewed.
a guy in that shady warehouse complex by the jail in maple ridge same thime, 146 plants, 4000 sog, chopped down to 146, lic renewed.
99% of the time police talk out their arses, mm
Push it back. The longer the better.
I remember an alarmist in this thread saying it was all over in 30 days. Unless it is info from HC in the Gazette, I am not holding my breath on anything. Maybe check this out.Peace GS
http://www.cmpa-acpm.ca/cmpapd04/do..._release_form_for_medical_practitioners-e.cfm