Res - I used a drain fitting, drilled a hole about and an inch from the bottom an d installed it using Teflon tape...
Control bucket - I installed a float valve that attaches to the res using a 1/2 hose... I installed it approx 3 inches from the bottom and adjusted it so it stopped the water from the res at 3"...
Then I drilled a hole and installed a tire valve at the same height as the tire valve in the ppk...
Control bucket - I installed a float valve that attaches to the res using a 1/2 hose... I installed it approx 3 inches from the bottom and adjusted it so it stopped the water from the res at 3"...
Then I drilled a hole and installed a tire valve at the same height as the tire valve in the ppk...