p0opstlnksal0t
Active member
Didn't get as much done this weekend as I'd hoped... the 2 unfinished exterior facing walls are now insulated and about 90% panda filmed. Next weekend I'll have I'll have the rest of the room insulated. Panda filmed with the 1" foam board panelling and skinned in 1/2" pine plywood sheathing.
After.the walls are insulated I'll air seal all of the electrical boxes before blowing in cellulose.
My basement tent is pretty stable at around 75f and 65rh I can live with that. My clones looked pretty clean. I'll keep them in quarantine treatment and will repot next weekend.
After.the walls are insulated I'll air seal all of the electrical boxes before blowing in cellulose.
My basement tent is pretty stable at around 75f and 65rh I can live with that. My clones looked pretty clean. I'll keep them in quarantine treatment and will repot next weekend.
Attachments
-
20171029_150201.jpg73.2 KB · Views: 16
-
20171029_150152.jpg67.7 KB · Views: 14
-
20171029_150225.jpg55.3 KB · Views: 11
-
20171029_150216.jpg52.4 KB · Views: 12
-
20171029_150210.jpg52.9 KB · Views: 12
-
Screenshot_2017-10-29-19-43-04.jpg26.7 KB · Views: 18
-
20171029_135539.jpg52.5 KB · Views: 13
-
20171029_133539.jpg37.9 KB · Views: 12