I have a couple questions on the electrical. Did the inspector allow stranded 14awg to be wirenutted to solid copper 14awg. It is permitted, but is frowned upon by the 3 electrical inspectors I've worked with. It looks like you're using 1 flip relay for 2 ballasts and 4 lights, not sure, but that's how it looks. Did your inspector permit that or overlook. The electrical inspectors I've worked with don't permit that, especially with flip relays.
Are there smoke, fire, and heat sensors wired in to provide emergency power off. It isn't mandatory, but a welcome feature for I E.
Nice setup VP. I have a couple questions on the electrical. Did the inspector allow stranded 14awg to be wirenutted to solid copper 14awg. It is permitted, but is frowned upon by the 3 electrical inspectors I've worked with. They prefer to see hardwired 14awg soow from the flip relay screw terminals to the mogul/junction box. Some of these IEs can be picky, but they see it as business that is income based, not a home theatre system being install, but a profit making venture, so why not be like Mike Holmes....lol
It looks like you're using 1 flip relay for 2 ballasts and 4 lights, not sure, but that's how it looks. Did your inspector permit that or overlook. The electrical inspectors I've worked with don't permit that, especially with flip relays.
Are there smoke, fire, and heat sensors wired in to provide emergency power off. It isn't mandatory, but a welcome feature for IE. I have a couple pics of some work I've done, do you mind if I post here VP.
What do you do with your trim? Do you need a hash maker? LOL
Just wanted to ask why some of the panels have several Aube timers alongside the PLCs. Awesome work man!Thanx VP. Here are a few panels and flips I've built.... I have a lot more pix, is it kewl to post more.
Damn, that is the best part...Throw it away.
Just wanted to ask why some of the panels have several Aube timers alongside the PLCs. Awesome work man!