the days progress so far.... headed back for more after my coffee.
split the room down the side long ways. now i have a 4' X 32' walkway down the one side in front of the door. this are is cut off from ductwork and vents so it will just be for racks, storage, tools etc.
the main room is now about 20x32 plus a 6x13 veg room. tomorrow the flood table goes in the veg room and plants will get put into bigger pots on drippers. hooking up CO2 and humidity control tonight. tomorrow will be building the frame for the lighting to hang as well as running the ductwork, power to the light controller and other shit. once that is done we will start building the PPK system and modular scrog trellis system. lots of cool ideas bouncing around in my head.
split the room down the side long ways. now i have a 4' X 32' walkway down the one side in front of the door. this are is cut off from ductwork and vents so it will just be for racks, storage, tools etc.
the main room is now about 20x32 plus a 6x13 veg room. tomorrow the flood table goes in the veg room and plants will get put into bigger pots on drippers. hooking up CO2 and humidity control tonight. tomorrow will be building the frame for the lighting to hang as well as running the ductwork, power to the light controller and other shit. once that is done we will start building the PPK system and modular scrog trellis system. lots of cool ideas bouncing around in my head.