Register ICMag Forum Menu Features
You are viewing our:
in:
Forums > Talk About It! > Cannabis Laws & Cannabis Legislation > WASHINGTON GROW ROOM CODE

Thread Title Search
Click to Visit Next Light Systems for LED lights
Post Reply
WASHINGTON GROW ROOM CODE Thread Tools Search this Thread
Old 10-01-2015, 07:30 PM #1
Marquis de Sod
Member

Marquis de Sod's Avatar

Join Date: Dec 2008
Location: Washington State
Posts: 640
Marquis de Sod has a spectacular aura aboutMarquis de Sod has a spectacular aura aboutMarquis de Sod has a spectacular aura aboutMarquis de Sod has a spectacular aura aboutMarquis de Sod has a spectacular aura about
WASHINGTON GROW ROOM CODE

This document may contain hyperlinks to internet web pages. To access this PDF docum
ent online, go to:
https://www.ElectricalCurrents.lni.wa.gov

Marijuana Processing and Extra
ction Facilities
Effective July 1, 2015, the
State Building Code Council
(SBCC) adopted an emergency rule,
WAC 51
-
54A
-
3800
to specify
requirements amending the International Fire Code dealing with marijuana processing and extraction facilities. Due to
these facilities’ use of flammable and combustible liquids for the liquid extraction process, building officials will require
these fac
ilities to provide an emergency power system, dedicated hazardous exhaust system and a continuous gas
detection system.
In addition
, specified electrical equipment must be interlocked with the gas detection system and
disabled when the gas
detecti
on system is activated.
The department of L&I cannot require these systems to be
installed, but similar to a fire alarm system, when the building official requires it, L&I will inspect to make sure it meets
NEC® and RCW 19.28 requirements.
These rules, alo
ng with other rulemaking proposals are open for public comment on
the
SBCC rulemaking page
of their website.
Comments must be received by close of business on October 23, 2015.
Summary
of the requirements of WAC 51
-
54A
-
3800
:

3802.4.3 Ventilation. Each marijuana extraction room shall be provided with a dedicated hazardous exhaust
system.

3802.4.6 Interlocks.
All electrical components within the extraction room shall be interlocked with the
hazardous exhaust system and when provided, the gas detection system.

3802.4.7 Emergency power for extraction process. An automatic emergency power source
(meeting the
requ
irements of NEC Article 700)
shall be provided with sufficient capacity to allow safe shutdown of the
process plus an additional 2 hours. The emergency power system shall supply the extraction room lighting,
ventilation system, gas detection system, emerge
ncy alarm system, and automatic fire extinguishing systems.

3802.6.2 The process using a flammable or combustible liquid shall be located within a hazardous exhaust fume
hood, rated for exhausting flammable vapors.
__________________
WORST FUCKING GROWER OF ALL TIME. OF ALL TIME!

I'm a 99%er. Time to kill the 1%. Like Aerosmith said: Eat The Rich!!!!!!
Marquis de Sod is offline Quote


Post Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT +2. The time now is 11:17 AM.


Click to buy Cannabis Seeds at Fast Buds


This site is for educational and entertainment purposes only.
You must be of legal age to view ICmag and participate here.
All postings are the responsibility of their authors.
Powered by: vBulletin Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.