What's new

Playing with Fire

Cabron

Member
Veteran
Gonna go 6' in height and place the bottom bulb 24" off the floor
with a nice 18" fan down there aiming up the epicenter to keep things chilly.

The next bulb will cover the next 24" with a 12" gap between them .

If it's raining all day tomorrow I guess I'll build this thing for him
and the light bar ...get the screen on and have him come over
and take a look ..

Then disassemble it ,collect some money and reassemble it
at his place .
 

Cabron

Member
Veteran
Wow man, beautiful your the 2nd person around I've seen in a green house! My other friends is just simply amazing, their third year running it, and it only get better as you adjust fromt he learning curve from what I can tell.... You are a lucky man with that :dance013:



***man o' man didn't even see hte pics after the first-set... You are luckkkkkky


much thanks my friend..
I have plenty to do out there before fall

install water heater (nat Gas) for floor hydronic heat
install furnace ...thermostats for 3 stages
water solenoids for an automated system fed by a minidos
injector pulling a premixed nute solution from a 55 gal drum.

Install drain system from all plant sites to floor drains
cover beams with aluminum facia inside throughout .

HAF fans need to be installed with a variable controller


well you get the point ...


trying to do this while me n my boss have 5 big custom
tile jobs all in the works is real fun..

Then trying to spend time with my lil lady friend as well..

Life is a party .....


picture.php



picture.php
 
Top